Introducing zCart, our cutting-edge Multivendor Marketplace Solution based on the robust Laravel Framework. Elevate your e-commerce game with a feature-rich, self-hosted script that puts you in control.
600
The route includes 10-13 major interchanges, linking vital highways such as NH-48 (Mumbai-Ahmedabad), the Mumbai-Pune Expressway , and the Atal Setu (MTHL) . Project Specifications Design Speed: 120 km/hr.
Mumbai's 14-lane mega Virar-Alibaug corridor gets Cabinet green light
Virar Alibaug Multimodal Corridor: Route & Status (2026)
Runs from Navghar (near Virar) to Balavali . This section is the priority, with 80-90% of land already acquired as of early 2026. Phase 2 (29.9 km): Extends from Balavali to Alibaug .